Calculators · Crushed Stone Calculator

Driveways and bases

Crushed Stone Calculator

Enter an area and depth to get tons and cubic yards of crushed stone, with an option to allow for compaction.

Area 1
Shape
Length
Width
Depth

Optional. For waste or spillage. Empty means 0.

How much the layer shrinks when compacted. It fills in when you pick a GoodGravel material, and you can change it.

Off by default, so the depth is the loose depth you spread. On, the calculator adds the extra stone that compaction removes.

Sets the weight of one cubic yard. The sources do not agree, so pick the one closest to your product or choose “Custom density”.

Type the density of your material.

How to calculate how much crushed stone you need

Crushed stone is sold by the ton or by the cubic yard. Start with the volume of the space, then turn it into weight with the density of the stone you are buying.

StepFormula
1. Cubic feetlength (ft) × width (ft) × depth (ft)
2. Cubic yardscubic feet ÷ 27
3. Poundscubic yards × pounds per cubic yard
4. Short tonspounds ÷ 2,000

A depth in inches must be divided by 12 before you multiply, because 4 inches is 0.3333 feet. This calculator does it for you, and it also reads measurements typed like 10'6" or 10 ft 6 in. For a round area, pick “Circle” and type the diameter. Add one area for each separate piece and the total updates as you type.

Loose depth or finished depth?

Crushed stone settles when it is compacted. GoodGravel explains it for crusher run: compaction is about 15 percent, so a 6 inch loose layer ends up about 5 inches. If the depth you have in mind is the finished depth, you need more stone than the plain volume says. Tick “The depth I typed is the finished depth after compacting” and the calculator finds the loose depth with this formula.

StepFormula
Loose depthfinished depth ÷ (1 − compaction ÷ 100)
Example4 in ÷ (1 − 0.15) = 4.71 in

The compaction box fills in with the figure GoodGravel lists for the material you pick, and you can change it. It stays off by default. The weights from Rohrer’s Quarry in the menu marked “compacted” are already after compaction, so the box is switched off for them.

Example: a driveway with a crusher run base

A driveway strip measures 10 ft by 40 ft and you want 4 inches of crusher run as the finished depth, with the 15% compaction GoodGravel lists for it. The figure used here is 3,200 pounds per cubic yard, the midpoint of its 3,000 to 3,400 range.

StepOperationResult
Cubic feet, finished10 × 40 × (4 ÷ 12)133.33 ft³
Cubic feet, loose133.33 ÷ (1 − 0.15)156.86 ft³
Cubic yards156.86 ÷ 275.8097 yd³
Pounds5.8097 × 3,20018,591 lb
Short tons18,591 ÷ 2,0009.30 tons

With the full 3,000 to 3,400 range instead of the midpoint, the same job weighs 8.71 to 9.88 tons. Without the compaction allowance the volume would be 4.94 cubic yards and the weight 7.90 tons, so ignoring compaction here leaves you about 1.4 tons short.

How much does a cubic yard of crushed stone weigh?

Crushed stone is sold by a size number, and a smaller number means bigger stone. GoodGravel is an information site and gives a range and a compaction figure for each size. The sizes below are the ones it describes, and other quarries draw the limits a little differently.

StoneSizePounds per yd³Tons per yd³Compaction
#4 stone1 to 1.5 in2,700 to 3,1001.35 to 1.555%
#57 stone3/4 to 1 in2,700 to 3,1001.35 to 1.558%
#8 stone3/8 to 1/2 in2,600 to 3,0001.30 to 1.506%
#89 stone3/8 in and smaller2,600 to 3,0001.30 to 1.508%
Crusher run, road base3/4 or 1.5 in minus3,000 to 3,4001.50 to 1.7015%
Crushed stone, generalvarious2,700 to 3,1001.35 to 1.5510%

Stone Centers, a stone supplier in Ohio, gives 2,700 to 3,400 pounds for crushed stone. Rohrer’s Quarry in Pennsylvania gives a loose and a compacted weight for each product. It does not say which ton its calculator uses, and as a US quarry we read it as the 2,000 lb short ton, converting tons per cubic foot × 2,000 × 27.

Rohrer’s productLoose, lb per yd³Compacted, lb per yd³
AASHTO #1 (3/4 to 4 in)2,4302,699
AASHTO #3 (1/2 to 2.5 in)2,4042,728
AASHTO #8 (1/4 to 1/2 in)2,3492,602
AASHTO #10 stone dust (fines to 3/8 in)2,6443,010
AASHTO #57 / 2B (1/4 to 1.5 in)2,4302,799
AASHTO #67 (1/4 to 1 in)2,3492,641
2A (fines to 1.5 in)2,7833,596

Luck Stone and Mulzer, two quarries, use one flat figure for every product in their own calculators: 2,800 and 3,000 pounds per cubic yard. Gravelshop uses 2,410 for every stone product we opened, including #57, #67, #89 and #4, and adds 15% for compression on top. All of these are in the material menu. If you know the density of your product, choose “Custom density” and type it.

How many square feet does a ton of crushed stone cover?

A ton fills 2,000 ÷ (pounds per cubic yard) cubic yards, and a cubic yard spread over a surface covers 324 ÷ depth in inches square feet. The table uses a loose Rohrer’s figure for #57, the midpoint of the GoodGravel range for #57 and the midpoint for crusher run. The second tab of the calculator does the same for any amount and depth.

Weight of a cubic yard2 in3 in4 in6 in
2,430 lb (1.22 tons)133896744
2,900 lb (1.45 tons)112745637
3,200 lb (1.60 tons)101685134

Layers and depths

How deep the stone goes depends on the job. Stone Centers recommends 4 to 6 inches of crushed limestone or paver base under paver paths, walkways and driveways. GoodGravel describes a standard three-layer gravel driveway as 4 inches of #3 or #4, then 3 to 4 inches of #57, then 2 inches of #8 or crusher run, and says 4 to 6 inches of crusher run alone can work on firm ground. It also describes the paver base as 4 inches of compacted crusher run under 1 inch of sand or stone dust. Run the calculator once for each layer, because each layer is a different stone. Follow the specification of your contractor or your town for the real build.

What “3/4 inch” stone means

GoodGravel lists “3/4 inch crushed stone” as another name for #57 and “3/4 inch minus” as another name for crusher run. They are different products, one clean and one with the dust left in, so ask your supplier which one they sell before you pick a density. For loose stone of all kinds in one calculator, see the stone calculator. For decorative stone, see the pea gravel and river rock calculators.

Tips for ordering crushed stone

  • Ask the supplier how they sell the stone. Many quarries give their estimates in tons, so the tons in the result are the number to compare.
  • Decide first whether your depth is loose or finished, and use the compaction box to match.
  • Ask for the weight of the exact product and use “Custom density” to type it.
  • Use the extra box for the allowance your supplier or contractor recommends. It raises the volume and the weight together.

Frequently asked questions

How do I calculate how much crushed stone I need?

Multiply length by width by depth, all in feet, then divide by 27 to get cubic yards. Turn inches of depth into feet by dividing by 12. Multiply the cubic yards by the weight of one cubic yard of your stone and divide by 2,000 to get short tons. A 10 ft by 10 ft area at 4 inches deep is 10 × 10 × 0.3333 = 33.33 cubic feet, which is 1.23 cubic yards.

How many tons of crushed stone are in a cubic yard?

GoodGravel gives 1.35 to 1.55 short tons per cubic yard for crushed stone, #57 and #4, 1.30 to 1.50 for #8 and #89, and 1.50 to 1.70 for crusher run. Rohrer’s Quarry uses 1.17 to 1.39 for its loose products and 1.30 to 1.80 once compacted. The figure moves with the size of the stone, moisture and compaction, so ask your supplier for the product you are buying.

How much crushed stone do I need for a driveway?

A driveway of 12 ft by 40 ft with 4 inches of crusher run is 160 cubic feet, which is 5.93 cubic yards. At 3,200 pounds per cubic yard, the midpoint of the GoodGravel range, that is 9.48 short tons. If the 4 inches is the finished depth after compacting 15%, you need 6.97 cubic yards and 11.15 tons. Tick the compaction box in the calculator to add that allowance.

How many square feet does a ton of crushed stone cover?

At 2,900 pounds per cubic yard, one ton covers about 112 square feet at 2 inches, 74 at 3 inches, 56 at 4 inches and 37 at 6 inches. Denser stone covers less. GoodGravel gives a rule of thumb of about 55 square feet per ton at 4 inches for crusher run and about 60 for #4 stone. Use the second tab of the calculator for your own numbers.

Should I add extra for compaction?

It depends on whether your depth is the loose depth you spread or the finished depth after compacting. GoodGravel lists the compaction as about 15% for crusher run, 10% for crushed stone in general, 8% for #57 and 5% for #4. A 6 inch loose layer of crusher run ends up about 5 inches. The calculator divides the finished depth by one minus the compaction to find the loose depth.

What does 3/4 inch crushed stone mean?

It is not one product. GoodGravel lists “3/4 inch crushed stone” as another name for #57 and “3/4 inch minus” as another name for crusher run. #57 is clean stone with no fines and crusher run keeps the dust. Ask your supplier which one they mean, because the weight and the compaction are different.

How deep should crushed stone be?

Stone Centers recommends 4 to 6 inches of crushed limestone or paver base under paver paths, walkways and driveways. GoodGravel describes a three-layer gravel driveway as 4 inches of #3 or #4, then 3 to 4 inches of #57, then 2 inches of #8 or crusher run, and says 4 to 6 inches of crusher run alone can work on firm ground. Follow your contractor or the local specification.

We use our own technical cookies and, if you allow it, Google Analytics cookies to see which calculators are used most. Press “Accept” to allow analytics, “Reject” to refuse them or “Configure” to choose. If you don’t accept, we still measure visits without cookies and with approximate figures. You can change your mind at any time from the footer. More details in the cookie policy.